What is the process to obtain a wastewater permit?
  1. Bring a copy of the applicable Zoning Building Permit to the Jefferson County Health Department at 1212 Walnut - U.S. Highway 59 in Oskaloosa, along with a pre-site drawing showing the location of structures on the property, desired placement of the wastewater system, and all private active or abandoned water wells.

  2. Complete the Permit Application form and pay the current permit fee at the Health Department.

  3. Schedule an appointment for the Jefferson County environmental specialist (ES) to complete a site visit to confirm appropriate placement of the wastewater system.

  4. Have a Jefferson County licensed installer install the wastewater system.

  5. Notify the Health Department when the system has been laid in the ground and prior to covering the system.

  6. Following the final inspection and approval of the ES, cover the system.

  7. Assure the installer submits the as-built drawing of the system to the Health Department.

  8. The permit is then issued to the owner, with a copy sent to Jefferson County Planning and Zoning.

Show All Answers

1. Why should I be concerned about water resources?
2. How do I know if I need a wastewater permit?
3. What is the process to obtain a wastewater permit?
4. What is the process to obtain a well water permit?
5. What should be done if a wastewater system may not be functioning correctly?
6. Can a property owner know where to place a wastewater system or private well prior to being ready to build a structure?
7. What penalties apply to violation of the Jefferson County environmental / sanitation code?
8. What can be done to increase the efficiency and life use of a septic system?
9. What can be done to increase the efficiency and life use of a lagoon?